Register Now - Every Drop Matters: Reducing Product Loss in Sterile Filtration
News|Articles|March 7, 2025

Construction Efficiency with The floorlessPOD: A G-CON Prefabricated Cleanroom Solution

Author(s)G-CON

G-CON’s floorlessPOD is a free-standing structure that provides direct integration with the host facility floor, eliminating the need for ramps, platforms and stairs typically required with prefabricated structures that have integrated floors. With fully integrated MEP, the floorlessPOD is an ideal solution when the cleanroom cannot be structurally supported by the host facility.


Related to this article

The BioPharm Brief: A Matrix-Targeting ADC in Head and Neck Cancer, an RNAi Approval in Myasthenia Gravis, and AbbVie Bets on AND-Gated Bispecifics
Pyxis Oncology’s EDB+FN-targeting ADC micvotabart pelidotin shows a 39% confirmed response rate in previously treated head and neck cancer, FDA approves Regeneron and Alnylam’s cemdisiran (Livsayis) as the first RNAi therapy for generalized myasthenia gravis, and AbbVie partners with DISCO Pharmaceuticals on AND-gated bispecifics for solid tumors.
The BioPharm Brief: A First for Streamlined Biosimilar Approval, a Head-to-Head Bispecific Trial in Wet AMD, and In Vivo KIR-CAR T
Biocon’s pertuzumab biosimilar Pebrilzo becomes the first biosimilar approved under EMA’s tailored clinical approach, Visara doses the first patient in a phase 2b trial comparing its VEGF-A/ANG-2 bispecific VIS-101 with aflibercept in wet AMD, and Verismo Therapeutics licenses Stanford’s PACK-IT technology for in vivo KIR-CAR T therapies.