Best Practices for Technology Transfer - Clear documentation and open communication are essential for effective technology transfer. - BioPharm International

ADVERTISEMENT

Best Practices for Technology Transfer
Clear documentation and open communication are essential for effective technology transfer.


BioPharm International
Volume 24, Issue 6, pp. 50-54, 57

DESIGN OF TECHNOLOGY TRANSFER- BASED MANUFACTURING PROCESS

Although a transferred process should ideally remain the same as the original, in practice, the process always undergoes adaptation at the receiving site, mostly due to the difference in equipment between the sending and receiving sites, as well as the need for scale-up of the entire process. The adaptation approach is different for different process steps. With an understanding of the process through the technology transfer document package and direct communication between sending and receiving sites, the anticipated GMP manufacturing process can be designed in detail.


Figure 2: Schematic workflow route to the design of a manufacturing process based on technology transfer.
Prior to the manufacturing process design, the desired scale of the overall process is often decided based on the amount of bulk drug substance required. The scale of each unit operation at the receiving site is then selected based on the scale-up factor and expected product recovery in each process step. The anticipated approach of operation and consequently the technical feasibility of each unit operation can be visualized at this stage. The decision to modify any process step or to split a part of the process into several runs in parallel or series can also be made. Eventually, a detailed process flow diagram containing in-depth activities in each unit operation can be generated (see Figure 2).

The operation of an overall biopharmaceutical manufacturing process is always executed in batch mode. The intermediate process bulks are stored at certain conditions before using in the next process steps. The required duration of each process step at the technology receiving site may vary from the sending site, particularly due to the difference in equipment and scale. This affects the storage duration of the intermediate process bulks. In addition, due to the larger volumes, the actual cooling and warming rates of intermediate process bulks may not be equal to the original small-scale process when both are stored at the same temperature. Scheduling of each process step in a biopharmaceutical manufacturing process, therefore, is a significant part of overall process design.

The selection and design of process conditions and process equipment are interrelated. The process conditions should be kept the same as the original process at the sending site or should be changed according to the scale-up factor. How to change different process parameters upon scale-up is not within the scope of this article and can be found in the literature (4). Critical raw materials, that define the performance of the process, should not be changed at the receiving site. The equipment selected or designed for executing the process must be compatible with the desired raw materials and must ensure the performance at the desired process conditions and parameters. In reality, however, the existing equipment often necessitates changes in process conditions and parameters due to the significant investment required for setting up new equipment for GMP production.


blog comments powered by Disqus

ADVERTISEMENT

Moscow Hosts IFPMA Biosimilars Conference
May 17, 2013
AbbVie and Alvine Will Collaborate on Celiac Disease Therapy
May 15, 2013
FDA Issues Pharmacoepidemiologic Safety Study Guidance
May 14, 2013
USP Launches Initiative to Fight Counterfeit Drugs in Sub-Saharan Africa
May 13, 2013
Amgen Forms New Joint Venture to Commercialize Vectibix in China
May 13, 2013
Upcoming Conferences
UPCOMING CONFERENCES

Access Programs for Investigational and Pre-Launch Drugs
Philadelphia, PA | July 17-18, 2013
Request Brochure

Strategic Pipeline Planning & Portfolio Valuation
Philadelphia, PA | August 13-14, 2013
Request Brochure

MES 2013 - Forum on Manufacturing Execution Systems
Philadelphia, PA | August 14-15, 2013
Request Brochure

Mobile Innovation for the Life Sciences Industry
Philadelphia, PA | August 20-21, 2013
Request Brochure

See All Conferences >>

ADVERTISEMENT

Author Guidelines
FindPharma
Source: BioPharm International,
Click here