Analytical Method Maintenance - Several steps can be taken to maintain test method suitability after the formal completion of the analytical method validation studies - BioPharm International

ADVERTISEMENT

Analytical Method Maintenance
Several steps can be taken to maintain test method suitability after the formal completion of the analytical method validation studies


BioPharm International


Understanding the Relationship of All Components

There are numerous ways that process and method performance knowledge can be used to monitor and improve overall process and product quality. In reality, unlimited time and resources are not always available and we should first identify the most critical components and maintain committed to implement critical improvements before we get lost in too much data. A hypothetical example is provided to illustrate how acceptance criteria for AMTs and AMMs could be derived with respect to estimated probabilities for 1A–B and 2A–B. Following from this example, potential improvements are discussed to illustrate what could be done to reduce the undesirable probabilities for cases 1B and 2A-B.

A potency bioassay is used for downstream in-process and final container testing of a licensed biopharmaceutical drug. This method is monitored in our AMM program. After months of commercial production, transfer of this analytical method to a different laboratory for product release testing is needed. If the downstream in-process stage is yielding inconsistent potency results (Table 2), the following data should be reviewed:

  • process development
  • process validation
  • AMD
  • AMV
  • historical process
  • method performance (assay control) data.


Table 2. Historical process, sampling, assay performance data, and suggested limits for accuracy and (intermediate) precision
We may want to start with the easiest variance component, the assay variance, as monitored with the assay control. Figure 1 illustrates the relationship between the assay performance and observed recent SPC potency results (last n = 60).

The statistical likelihood for failures now needs to be estimated and a component variance analysis performed to estimate the contribution of each component. Focus can then be put on how to set limits on post-validation activities from understanding the potential impact on the likelihood for all cases (1A–2B) to occur. The situation can be most effectively improved by primarily having in mind patient safety, dosing, and regulatory expectations, but secondarily also the firm as the need to pass specifications and stay profitable is important. Similar to propagation-of-error calculations, an estimate for the sampling variance (batch-uniformity, stability, protein adsorption losses, etc.), could allow immediate estimation of the actual (true) process performance for potency by simply solving for it from Equation 1 (V = variance):

Equation 1: [V observed for process ] 2 = [V assay ] 2 + [V sampling/batch uniformity ]2 + [V actual for proces s] 2

Equation 2: [CV% Potency] 2 = 1/n [ (CV% Inter-assay) 2 + (CV% Sampling) 2 /(# sampling units) + (CV% Intra-assay) 2 /( # sampling units) x (replicates for each sample)]


blog comments powered by Disqus

ADVERTISEMENT

ADVERTISEMENT

FDA Approves Pfizer's Trumenba for the Prevention of Meningitis B
October 30, 2014
EMA: Extrapolation Across Indications for Biosimilars a Possibility
October 30, 2014
Bristol-Myers Squibb Announces Agreement to Acquire HER2-Targeted Cancer Treatment
October 29, 2014
Contract Research and Manufacturing Organization Paragon Bioservices Raises $13 Million
October 28, 2014
Yale and Gilead Extend Sequencing Initiative
October 28, 2014
Author Guidelines
Source: BioPharm International,
Click here