LSNE Completes FDA Inspection - - BioPharm International

ADVERTISEMENT

LSNE Completes FDA Inspection


Lyophilization Services of New England (LSNE), a New Hampshire based contract-manufacturing organization, has completed an FDA inspection of its Manchester manufacturing facility. This is the sixth successful inspection of the site, which is currently functioning as a multiproduct medical device manufacturing facility. The November 2013 inspection was a combination FDA general GMP and pre-approval inspection. The inspection resulted in no Form 483 being issued, as there were no observations noted by FDA.

This FDA inspection follows a successful UK Medicines and Healthcare Products Regulatory Agency (MHRA) inspection of the LSNE 25 Commerce Drive, Bedford NH contract pharmaceutical manufacturing facility in which LSNE received a certificate of GMP Compliance from the MHRA to manufacture aseptic lyophilized drug products for use in the EU.

Source: Lyophilization Services of New England

 

blog comments powered by Disqus

ADVERTISEMENT

ADVERTISEMENT

European Commission Approves RoACTEMRA for Treatment of RA
September 9, 2014
PDA Announces Technical Report on Drug Shortages
September 9, 2014
Infinity and AbbVie Collaborate to Develop Oncology Drug
September 5, 2014
Merck KGaA Breaks Ground on Facility in China
September 5, 2014
DPT Laboratories Acquires Media Pharmaceuticals' Lakewood Facilities
September 5, 2014
Author Guidelines

Click here